In July 2026 the Florida Building Commission voted down 22 mass timber provisions for its building code. Tall timber construction is now allowed in 44 other states. If you design, bid or review timber buildings, the gap between those two facts decides how long a permit takes. This guide explains what the model code actually allows, what changed in Florida, and what it means for a project.
Quick answer: since the 2021 International Building Code (IBC), tall mass timber buildings are covered by three construction types, IV-A, IV-B and IV-C, which allow mass timber or noncombustible materials up to 18, 12 and 9 stories. Florida's code does not include them, so each Florida mass timber project has to be approved case by case through the alternative materials clause.
What the IBC added: Types IV-A, IV-B and IV-C
The ICC Building Safety Journal calls the three new types historic, because new construction types are rare in the code. They are defined in Section 602.4 of the 2021 IBC, with related changes to the chapters on heights and areas, fire and smoke protection, special inspections, wood, and construction safeguards.
The difference between the three types is how much of the timber is covered by noncombustible protection (usually gypsum board):
- Type IV-A: structural elements completely protected with noncombustible protection. WoodWorks lists this type for buildings up to 18 stories.
- Type IV-B: structural elements mostly protected. Up to 12 stories. The 2024 IBC added an allowance to expose mass timber ceilings and integral beams in this type, according to WoodWorks.
- Type IV-C: most structural elements left unprotected. Up to nine stories. Even here, ICC notes that concealed spaces, shaft walls and the exterior surface of outside walls still need noncombustible protection.

Why the code allows it: tests, not opinion
ICC explains that the ad hoc committee that wrote these provisions adopted a rule: it would not propose any requirement that had not been tested. Five full-scale, multiple-story fire tests were run at the ATF Fire Research Laboratory to simulate the three types. The committee set performance objectives that include no collapse in a complete burn-out of the fuel load without counting on sprinklers, no unusual fire department access problems, and highly reliable fire suppression whose reliability rises with height.
For an engineer this matters when you talk to a plan reviewer. The provisions are not a general approval of wood. They are a package of protection, sprinkler, height and inspection requirements that came from specific tests. Details like the actual char rates and connection protection come from the code text and the design standard, so check them in the edition your jurisdiction adopted.
What happened in Florida
Building Design + Construction reported on July 31, 2026 that the Florida Building Commission voted down 22 code provisions related to mass timber, against the recommendations of the commission's own fire and structural experts. Because the statewide code does not address mass timber, a local jurisdiction's first mass timber project has to go through an alternative materials and methods review. Under that clause, cities and counties can approve methods that match standard construction in quality, strength, fire resistance, durability and safety. The American Wood Council blamed competing material interests and misleading testimony for the vote. That is the council's position, not a finding of the commission.

Timber is still being built there
A September 2026 newsletter from Green Building News reports that Hines's T3 FAT Village in Fort Lauderdale, a six-story, 180,000 square foot office, was engineered for wind loads up to 120 mph and is due to finish later this year. The same newsletter reports that Skanska's 12-story Bevel near Seattle became the first US commercial office approved under the tall-timber Type IV-B path, and cites WoodWorks for 2,833 US mass timber projects built or underway as of June. We have not verified these project details against the owners' own documents, so treat them as reported figures.
What this means for a project
- Find the adopted code edition first. WoodWorks keeps a state by state list of who adopted the 2021 or 2024 IBC tall mass timber provisions, with local amendments, and advises checking with the specific jurisdiction.
- In an adopting state, design to the type you choose. The type sets how much timber you may expose, so the architectural intent (exposed ceilings or not) feeds directly into the choice between IV-A, IV-B and IV-C.
- Where the code is silent, budget time for the alternative path. You will need to show equivalence in strength, fire resistance, durability and safety, so early meetings with the building official help.
- Talk to the insurer early. Gallagher wrote in August 2026 that insuring mass timber often brings sticker shock, according to the same newsletter. It also reports that Zurich offers up to $75 million in builders-risk capacity per qualified project.
Cost and schedule claims: read the source
The Senate Appropriations Committee's FY27 explanatory statement, as quoted by the American Wood Council on November 23, 2026, says existing research shows mass timber can shorten construction time by 15 to 25 percent compared with traditional methods. It includes $15 million for a HUD mass timber housing demonstration with incentives of up to $20,000 per unit, and $5 million inside the PRO Housing program to help states and localities adopt mass timber code provisions. This is a funding proposal in a committee statement, not a law yet, and the figure comes from an industry association's release. Use it as context, not as a schedule guarantee for your own job.
For the carbon side of the same decision, see our guide to low-carbon concrete strategies for structural design and procurement. If you are pricing a comparison between a timber and a concrete scheme, start from a clean quantity list as described in construction takeoff for beginners.
FAQ
Is mass timber allowed in tall buildings in the US? Yes. The 2021 and 2024 IBC include Types IV-A, IV-B and IV-C for up to 18, 12 and 9 stories, and AWC and Building Design + Construction say tall timber is allowed in 44 states.
Can you still build mass timber in Florida? Yes, but the statewide code has no mass timber provisions after the July 2026 vote, so projects go through the alternative materials clause.
Can mass timber stay exposed? In Type IV-C most elements may be left unprotected, and the 2024 IBC added exposed ceilings and integral beams for Type IV-B, per WoodWorks and ICC.
Caveat: this is an educational summary, not design advice. Code text and local amendments control. Check the adopted edition and the authority having jurisdiction before relying on any number here.
Sources
- WoodWorks, Status of Building Code Allowances for Tall Mass Timber in the IBC (status as of September 2026)
- ICC Building Safety Journal, Tall mass timber provisions represent historic new building code requirements
- Building Design + Construction, Florida says no to mass timber code changes (July 31, 2026)
- Green Building News, Mass Timber: 44 States Said YES. Florida Said NO. (September 6, 2026)
- American Wood Council, Mass Timber Gets a $20 Million Boost (November 23, 2026)